International projects have very clear requirements for transformer testing. Before shipment, every transformer must complete a comprehensive testing process, including winding resistance testing, turn ratio testing, no-load loss testing, load loss testing, impedance testing, insulation testing, and partial discharge testing.
The IEC 60076 series of standards serves as the fundamental reference for our transformer design and testing procedures.
| Test Item | Purpose |
|---|---|
| Winding Resistance Test | Verify the quality of winding connections |
| Turn Ratio Test | Confirm the accuracy of voltage transformation ratio |
| No-load Loss Test | Evaluate core performance |
| Load Loss Test | Check winding losses |
| Insulation Test | Verify insulation strength and reliability |
| Partial Discharge Test | Identify potential insulation defects |
VIII. Overseas EPC Project Delivery
For overseas projects, completing the transformer manufacturing process at the factory only means half of the work is finished.
A complete delivery process also includes technical document preparation, drawing approval, FAT (Factory Acceptance Test), packaging and transportation, on-site installation support, and commissioning assistance.
Every stage requires careful management and coordination.
Nowadays, EPC customers no longer select suppliers based only on equipment price. The ability to provide complete technical support, the efficiency of drawing responses, and the capability to solve problems during site execution often have a greater impact on supplier selection than the quotation itself.
IX. Zisheng Electric’s Overseas Project Experience
After many years working on overseas projects, I increasingly believe that the success of a transformer is not determined only during the manufacturing stage.
Starting from the initial technical communication, manufacturers need to truly understand the customer’s actual requirements instead of simply designing products according to their own standard practices.
For example:
- In high-temperature regions, cooling capacity and thermal performance must be considered in advance.
- In renewable energy projects, load variations and system integration requirements need special attention.
- In industrial applications, long-term continuous operation reliability becomes the primary consideration.
Different application scenarios have different priorities, and the design approach must be adjusted accordingly.
These accumulated experiences are continuously integrated into our transformer design and manufacturing processes, creating a continuous improvement cycle.
About Zisheng Electric
Zisheng Electric specializes in transformer design, manufacturing, and overseas power project technical support. Our product portfolio covers Oil-Immersed Transformers, Compact Substation, Pad Mounted Transformers, Pole Mounted Transformers and Dry Type Transformers. as well as medium-voltage distribution equipment and complete power solutions.
If you have an ongoing project and need support with equipment selection, technical solutions, or parameter confirmation, feel free to send us your project details.
About ZISHENG ELECTRICAL
Zisheng are a professional 19+ years manufacturer in producing Oil-Immersed Transformers, Compact Substation, Pad Mounted Transformers, Pole Mounted Transformers and Dry Type Transformers. We own the certificates of ISO/CE/IEC 60076 and TUV Rheinland.
Transformers undergo rigorous FAT and type testing, support voltage/capacity customization. Welcome to consult for Catalog and Product. you can contact us at email [email protected].