{"id":2241,"date":"2026-08-25T17:58:34","date_gmt":"2026-08-25T09:58:34","guid":{"rendered":"https:\/\/zishengtransformer.com\/?p=2241"},"modified":"2026-08-25T17:58:34","modified_gmt":"2026-08-25T09:58:34","slug":"iec-transformer-manufacturing-process-oil-immersed-transformer-production-guide","status":"publish","type":"post","link":"https:\/\/zishengtransformer.com\/ar\/iec-transformer-manufacturing-process-oil-immersed-transformer-production-guide\/","title":{"rendered":"\u0639\u0645\u0644\u064a\u0629 \u062a\u0635\u0646\u064a\u0639 \u0645\u062d\u0648\u0644\u0627\u062a IEC: \u062f\u0644\u064a\u0644 \u0625\u0646\u062a\u0627\u062c \u0645\u062d\u0648\u0644\u0627\u062a \u0645\u063a\u0645\u0648\u0631\u0629 \u0641\u064a \u0627\u0644\u0632\u064a\u062a"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2242\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/1-Oil-immersed-power-transformer-for-Middle-East-power-grid-project.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"0\" data-end=\"214\">I am an engineer from the <strong data-start=\"26\" data-end=\"73\">transformer design team at Zisheng Electric<\/strong>, specializing in the design and manufacturing of <strong data-start=\"123\" data-end=\"213\">oil-immersed power transformers, high-voltage transformers, and grid project solutions<\/strong>.<\/p>\n<p data-start=\"216\" data-end=\"431\">Over the years, I have participated in technical support for multiple <strong data-start=\"286\" data-end=\"322\">110kV\/132kV transformer projects<\/strong>, covering design review, technical clarification, manufacturing coordination, and project execution support.<\/p>\n<p data-start=\"433\" data-end=\"855\">For <strong data-start=\"437\" data-end=\"453\">EPC projects<\/strong>, the manufacturing process of <strong data-start=\"484\" data-end=\"519\">oil-immersed power transformers<\/strong>, <strong data-start=\"521\" data-end=\"557\">Factory Acceptance Testing (FAT)<\/strong>, and compliance with <strong data-start=\"579\" data-end=\"602\">IEC 60076 standards<\/strong> are among the most important evaluation factors when selecting a transformer supplier. The IEC 60076 series provides requirements and test methods related to power transformer design, performance, and verification.<\/p>\n<p data-start=\"857\" data-end=\"973\">You may be searching for a reliable supplier, comparing technical bids, or simply trying to understand one question:<\/p>\n<p data-start=\"975\" data-end=\"1138\"><strong data-start=\"975\" data-end=\"1138\">When a transformer manufacturer claims IEC compliance, is the transformer really designed and manufactured according to the standard requirements step by step?<\/strong><\/p>\n<p data-start=\"1140\" data-end=\"1242\">Regardless of your reason for reading this article, I will explain the answer from three perspectives:<\/p>\n<ul data-start=\"1244\" data-end=\"1353\">\n<li data-section-id=\"1jgj3nc\" data-start=\"1244\" data-end=\"1283\"><strong data-start=\"1246\" data-end=\"1283\">Transformer manufacturing process<\/strong><\/li>\n<li data-section-id=\"6m43yi\" data-start=\"1284\" data-end=\"1316\"><strong data-start=\"1286\" data-end=\"1316\">Key quality control points<\/strong><\/li>\n<li data-section-id=\"1xanpum\" data-start=\"1317\" data-end=\"1353\"><strong data-start=\"1319\" data-end=\"1353\">IEC 60076-related requirements<\/strong><\/li>\n<\/ul>\n<p data-start=\"1355\" data-end=\"1557\">A complete <strong data-start=\"1366\" data-end=\"1400\">oil-immersed power transformer<\/strong> goes through more than ten major manufacturing stages and hundreds of control points, from incoming raw materials to final testing, packaging, and shipment.<\/p>\n<p data-start=\"1559\" data-end=\"1799\">Each stage corresponds to specific requirements within the <strong data-start=\"1618\" data-end=\"1631\">IEC 60076<\/strong> standard series, including design verification, temperature performance, insulation requirements, and routine testing procedures.<\/p>\n<p data-start=\"1801\" data-end=\"1876\" data-is-last-node=\"\" data-is-only-node=\"\">I will focus on the key parts that truly determine transformer reliability.<\/p>\n<p data-start=\"1801\" data-end=\"1876\" data-is-last-node=\"\" data-is-only-node=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2243\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/2-oil-immersed-transformer-manufacturing-process-according-to-IEC-60076.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<div class=\"qMYqUG_convSearchResultHighlightRoot\">\n<div class=\"\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-43\" data-is-intersecting=\"true\">\n<section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-43\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-43\" data-testid=\"conversation-turn-16\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\">\n<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"e5dda84c-02d9-43b8-9ecd-d33427a30b5e\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-thinking\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"fbskMG_root markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"0\" data-end=\"213\">First, let\u2019s look at a summary table to clearly understand the key control points and acceptance criteria for the seven core manufacturing processes. Each section below will then explain these processes in detail.<\/p>\n<div class=\"group TyagGW_tableContainer\">\n<div class=\"TyagGW_tableWrapper flex flex-col-reverse w-fit\" tabindex=\"-1\">\n<table class=\"w-fit min-w-(--thread-content-width)\" data-start=\"215\" data-end=\"2038\">\n<thead data-start=\"215\" data-end=\"322\">\n<tr data-start=\"215\" data-end=\"322\">\n<th class=\"last:pe-10\" data-start=\"215\" data-end=\"229\" data-col-size=\"sm\"><strong data-start=\"217\" data-end=\"228\">Process<\/strong><\/th>\n<th class=\"last:pe-10\" data-start=\"229\" data-end=\"254\" data-col-size=\"md\"><strong data-start=\"231\" data-end=\"253\">Key Control Points<\/strong><\/th>\n<th class=\"last:pe-10\" data-start=\"254\" data-end=\"280\" data-col-size=\"xl\"><strong data-start=\"256\" data-end=\"279\">Acceptance Criteria<\/strong><\/th>\n<th class=\"last:pe-10\" data-start=\"280\" data-end=\"309\" data-col-size=\"md\"><strong data-start=\"282\" data-end=\"308\">Relevant IEC Standards<\/strong><\/th>\n<th class=\"last:pe-10\" data-start=\"309\" data-end=\"322\" data-col-size=\"lg\"><strong data-start=\"311\" data-end=\"320\">Risks<\/strong><\/th>\n<\/tr>\n<\/thead>\n<tbody data-start=\"345\" data-end=\"2038\">\n<tr data-start=\"345\" data-end=\"676\">\n<td data-start=\"345\" data-end=\"365\" data-col-size=\"sm\"><strong data-start=\"347\" data-end=\"364\">Core Stacking<\/strong><\/td>\n<td data-start=\"365\" data-end=\"448\" data-col-size=\"md\">Silicon steel sheet joint accuracy, clamping torque, single-point core grounding<\/td>\n<td data-start=\"448\" data-end=\"573\" data-col-size=\"xl\">No-load loss shall not exceed the guaranteed design value; joint gaps shall comply with process documentation requirements<\/td>\n<td data-start=\"573\" data-end=\"600\" data-col-size=\"md\">IEC 60076-1; IEC 60076-2<\/td>\n<td data-start=\"600\" data-end=\"676\" data-col-size=\"lg\">Excessive joint gaps increase no-load losses, noise, and no-load current<\/td>\n<\/tr>\n<tr data-start=\"677\" data-end=\"1265\">\n<td data-start=\"677\" data-end=\"705\" data-col-size=\"sm\"><strong data-start=\"679\" data-end=\"704\">Winding Manufacturing<\/strong><\/td>\n<td data-start=\"705\" data-end=\"800\" data-col-size=\"md\">Axial\/radial winding compression force control, winding tension, insulation wrapping process<\/td>\n<td data-start=\"800\" data-end=\"1036\" data-col-size=\"xl\">Compression force meets process requirements; winding dimensions and conductor specifications comply with drawings; <strong data-start=\"918\" data-end=\"1035\">partial discharge is a final transformer factory test parameter and is not determined at this manufacturing stage<\/strong><\/td>\n<td data-start=\"1036\" data-end=\"1123\" data-col-size=\"md\">IEC 60317-0-1 (winding conductors); IEC 60076-5 (short-circuit withstand capability)<\/td>\n<td data-start=\"1123\" data-end=\"1265\" data-col-size=\"lg\">Insufficient compression may cause winding deformation and displacement during short circuits, reducing short-circuit withstand capability<\/td>\n<\/tr>\n<tr data-start=\"1266\" data-end=\"1624\">\n<td data-start=\"1266\" data-end=\"1286\" data-col-size=\"sm\"><strong data-start=\"1268\" data-end=\"1285\">Vacuum Drying<\/strong><\/td>\n<td data-start=\"1286\" data-end=\"1368\" data-col-size=\"md\">Solid insulation moisture content, vacuum level, temperature-time curve control<\/td>\n<td data-start=\"1368\" data-end=\"1466\" data-col-size=\"xl\"><strong data-start=\"1370\" data-end=\"1465\">Solid insulation paper moisture content &lt;0.3% (strict internal project control requirement)<\/strong><\/td>\n<td data-start=\"1466\" data-end=\"1537\" data-col-size=\"md\">IEC 60076-14 (thermal performance and drying process considerations)<\/td>\n<td data-start=\"1537\" data-end=\"1624\" data-col-size=\"lg\">Residual moisture accelerates insulation aging and reduces transformer service life<\/td>\n<\/tr>\n<tr data-start=\"1625\" data-end=\"2038\">\n<td data-start=\"1625\" data-end=\"1664\" data-col-size=\"sm\"><strong data-start=\"1627\" data-end=\"1663\">Oil Filling (Vacuum Oil Filling)<\/strong><\/td>\n<td data-start=\"1664\" data-end=\"1729\" data-col-size=\"md\">New oil filtration, degassing process, oil cleanliness control<\/td>\n<td data-start=\"1729\" data-end=\"1858\" data-col-size=\"xl\">New insulating oil dielectric loss (tan\u03b4@90\u00b0C) &lt;0.005; breakdown voltage and moisture content comply with new oil requirements<\/td>\n<td data-start=\"1858\" data-end=\"1956\" data-col-size=\"md\"><strong data-start=\"1860\" data-end=\"1902\">IEC 60296 (new mineral insulating oil)<\/strong>; IEC 60156 (breakdown voltage of insulating liquids)<\/td>\n<td data-start=\"1956\" data-end=\"2038\" data-col-size=\"lg\">Poor oil quality may cause partial discharge and reduce insulation reliability<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p data-start=\"2040\" data-end=\"2172\">The following sections will explain the quality control requirements of each process according to the actual manufacturing workflow.<\/p>\n<hr data-start=\"2174\" data-end=\"2177\" \/>\n<h2 data-section-id=\"1wh5nhc\" data-start=\"2179\" data-end=\"2259\"><span role=\"text\"><strong data-start=\"2181\" data-end=\"2259\">I. Oil-Immersed Transformer Core Manufacturing Process and Quality Control<\/strong><\/span><\/h2>\n<p data-start=\"2261\" data-end=\"2361\">During actual manufacturing, the transformer core is not simply an assembly of stacked steel sheets.<\/p>\n<p data-start=\"2363\" data-end=\"2641\">For <strong data-start=\"2367\" data-end=\"2419\">high-voltage and extra-high-voltage transformers<\/strong>, the quality of core joints directly affects no-load losses and noise performance. Therefore, transformer inspectors and third-party supervision teams often treat core stacking as a key witness point during manufacturing.<\/p>\n<h3 data-section-id=\"13z8biw\" data-start=\"2643\" data-end=\"2682\"><span role=\"text\"><strong data-start=\"2646\" data-end=\"2682\">1.1 Incoming Material Inspection<\/strong><\/span><\/h3>\n<p data-start=\"2684\" data-end=\"2838\">The transformer core uses <strong data-start=\"2710\" data-end=\"2776\">high magnetic permeability grain-oriented silicon steel sheets<\/strong>, with <strong data-start=\"2783\" data-end=\"2794\">B30R090<\/strong> commonly used as a starting-grade material.<\/p>\n<p data-start=\"2840\" data-end=\"3012\">After the material arrives at the factory, incoming inspection is carried out based on the steel manufacturer\u2019s quality certificates and the <strong data-start=\"2981\" data-end=\"3011\">IEC 60404 series standards<\/strong>.<\/p>\n<p data-start=\"3014\" data-end=\"3039\">Inspection items include:<\/p>\n<ul data-start=\"3041\" data-end=\"3169\">\n<li data-section-id=\"3cshcc\" data-start=\"3041\" data-end=\"3099\">Silicon steel sheet thickness and dimensional accuracy<\/li>\n<li data-section-id=\"r83mr2\" data-start=\"3100\" data-end=\"3121\">Surface condition<\/li>\n<li data-section-id=\"1ru7gdo\" data-start=\"3122\" data-end=\"3152\">Insulation coating quality<\/li>\n<li data-section-id=\"1wu8lp4\" data-start=\"3153\" data-end=\"3169\">Burr control<\/li>\n<\/ul>\n<p data-start=\"3171\" data-end=\"3218\">Key magnetic performance indicators, including:<\/p>\n<ul data-start=\"3220\" data-end=\"3279\">\n<li data-section-id=\"1qloyvk\" data-start=\"3220\" data-end=\"3233\">Core loss<\/li>\n<li data-section-id=\"8vv7rd\" data-start=\"3234\" data-end=\"3259\">Magnetic flux density<\/li>\n<li data-section-id=\"17ejknf\" data-start=\"3260\" data-end=\"3279\">Stacking factor<\/li>\n<\/ul>\n<p data-start=\"3281\" data-end=\"3348\">are verified through the steel manufacturer\u2019s factory test reports.<\/p>\n<p data-start=\"3350\" data-end=\"3499\">These parameters directly determine the magnetic performance of the transformer core and have a significant impact on <strong data-start=\"3468\" data-end=\"3498\">transformer no-load losses<\/strong>.<\/p>\n<p data-start=\"3501\" data-end=\"3702\">For <strong data-start=\"3505\" data-end=\"3535\">Saudi Arabia 60Hz projects<\/strong>, magnetic performance parameters should be carefully verified through frequency conversion calculations to ensure the core design matches actual operating conditions.<\/p>\n<hr data-start=\"3704\" data-end=\"3707\" \/>\n<h3 data-section-id=\"1xk6mlj\" data-start=\"3709\" data-end=\"3747\"><span role=\"text\"><strong data-start=\"3712\" data-end=\"3747\">1.2 Silicon Steel Sheet Cutting<\/strong><\/span><\/h3>\n<p data-start=\"3749\" data-end=\"3785\">Core cutting is a precision process.<\/p>\n<p data-start=\"3787\" data-end=\"3901\">We use <strong data-start=\"3794\" data-end=\"3847\">German-brand longitudinal and cross-cutting lines<\/strong>, with cutting accuracy controlled within <strong data-start=\"3889\" data-end=\"3900\">\u00b10.2 mm<\/strong>.<\/p>\n<p data-start=\"3903\" data-end=\"3934\">Why is such accuracy necessary?<\/p>\n<p data-start=\"3936\" data-end=\"4027\">Because during core stacking, poor alignment of joints increases the effective <strong data-start=\"4015\" data-end=\"4026\">air gap<\/strong>.<\/p>\n<p data-start=\"4029\" data-end=\"4055\">A larger air gap leads to:<\/p>\n<ul data-start=\"4057\" data-end=\"4142\">\n<li data-section-id=\"zep9hq\" data-start=\"4057\" data-end=\"4082\">Higher no-load losses<\/li>\n<li data-section-id=\"167kisf\" data-start=\"4083\" data-end=\"4115\">Increased excitation current<\/li>\n<li data-section-id=\"1xvoavm\" data-start=\"4116\" data-end=\"4142\">Higher operating noise<\/li>\n<\/ul>\n<p data-start=\"4144\" data-end=\"4325\">In desert operating conditions, additional losses are ultimately converted into heat. Even with a strong cooling system, excessive core losses can create unnecessary thermal stress.<\/p>\n<p data-start=\"4327\" data-end=\"4479\" data-is-last-node=\"\" data-is-only-node=\"\">Therefore, precision cutting is not only a manufacturing requirement \u2014 it is directly related to the transformer\u2019s long-term efficiency and reliability.<\/p>\n<p data-start=\"4327\" data-end=\"4479\" data-is-last-node=\"\" data-is-only-node=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2244\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/3-Transformer-core-cutting-and-stacking-process.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<div class=\"qMYqUG_convSearchResultHighlightRoot\">\n<div class=\"\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-45\" data-is-intersecting=\"true\">\n<section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-45\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-45\" data-testid=\"conversation-turn-20\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\">\n<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"3722dde6-b455-433a-b17d-c0b10396b0a8\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-thinking\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<h3 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"czt9is\" data-start=\"0\" data-end=\"33\"><span role=\"text\"><strong data-start=\"4\" data-end=\"33\">1.3 Core Stacking Process<\/strong><\/span><\/h3>\n<p data-start=\"35\" data-end=\"102\">A <strong data-start=\"37\" data-end=\"93\">fully mitered three-step overlapping joint structure<\/strong> is used.<\/p>\n<p data-start=\"104\" data-end=\"439\">During the stacking process, workers use a <strong data-start=\"147\" data-end=\"163\">feeler gauge<\/strong> for sampling inspection after each layer is stacked. The gap must not exceed <strong data-start=\"241\" data-end=\"251\">0.3 mm<\/strong>. After the entire core assembly is completed, a <strong data-start=\"300\" data-end=\"323\">closed-circuit test<\/strong> is performed to measure the <strong data-start=\"352\" data-end=\"392\">core-to-ground insulation resistance<\/strong> and check for <strong data-start=\"407\" data-end=\"438\">interlaminar short circuits<\/strong>.<\/p>\n<p data-start=\"441\" data-end=\"865\">In one Saudi project, the customer\u2019s third-party inspection engineer brought a <strong data-start=\"520\" data-end=\"554\">0.02 mm precision feeler gauge<\/strong> and inspected the core joints layer by layer. What was written in the final acceptance report? <strong data-start=\"650\" data-end=\"716\">\u201cThe core stacking quality exceeds IEC standard requirements.\u201d<\/strong> That is exactly the result we aim for. Although these details increase manufacturing costs, they can effectively reduce long-term operational risks.<\/p>\n<h2 data-section-id=\"9wzzoi\" data-start=\"867\" data-end=\"882\"><span role=\"text\"><strong data-start=\"870\" data-end=\"882\">II. Coil<\/strong><\/span><\/h2>\n<p data-start=\"884\" data-end=\"1175\">Winding manufacturing directly determines the long-term operating reliability of the transformer. Especially under conditions such as short-circuit impact, electromagnetic vibration, and repeated thermal cycling, winding mechanical strength and insulation margin are the key control factors.<\/p>\n<h3 data-section-id=\"8h26g2\" data-start=\"1177\" data-end=\"1224\"><span role=\"text\"><strong data-start=\"1181\" data-end=\"1224\">2.1 Conductors and Insulation Materials<\/strong><\/span><\/h3>\n<p data-start=\"1226\" data-end=\"1912\">The winding conductors use oxygen-free copper conductors or copper foil. Winding conductors and insulation materials are manufactured according to the corresponding IEC material standards. <strong data-start=\"1415\" data-end=\"1467\">Enamelled wire and paper-covered wire conductors<\/strong> comply with the <strong data-start=\"1484\" data-end=\"1497\">IEC 60317<\/strong> series requirements, while <strong data-start=\"1525\" data-end=\"1585\">solid insulation materials such as insulation paperboard<\/strong> comply with the <strong data-start=\"1602\" data-end=\"1615\">IEC 60641<\/strong> series requirements. Insulation thickness is determined based on electric field simulation calculations. The thermal aging performance of the insulation system is evaluated according to <strong data-start=\"1802\" data-end=\"1815\">IEC 60216<\/strong>, while the electrical withstand level follows the test requirements of the <strong data-start=\"1891\" data-end=\"1904\">IEC 60076<\/strong> series.<\/p>\n<p data-start=\"1914\" data-end=\"2111\">For renewable energy projects in the Middle East, it is also necessary to consider the thermal-mechanical alternating stress caused by load fluctuations and large day-night temperature differences.<\/p>\n<h3 data-section-id=\"bsi6lf\" data-start=\"2113\" data-end=\"2139\" data-is-last-node=\"\" data-is-only-node=\"\"><span role=\"text\"><strong data-start=\"2117\" data-end=\"2139\" data-is-last-node=\"\">2.2 Winding Method<\/strong><\/span><\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2245\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/4-High-voltage-winding-manufacturing-for-oil-immersed-transformer.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<div class=\"qMYqUG_convSearchResultHighlightRoot\">\n<div class=\"\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-46\" data-is-intersecting=\"true\">\n<section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-46\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-46\" data-testid=\"conversation-turn-22\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\">\n<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"1dd47479-ef4b-40fd-9ddf-82a5a080cf89\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-thinking\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"fbskMG_root markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<p class=\"PDq2pG_selectionAnchorContainer\" data-start=\"0\" data-end=\"87\">The winding process is divided into two types \u2014 <strong data-start=\"48\" data-end=\"65\">layer winding<\/strong> and <strong data-start=\"70\" data-end=\"86\">disc winding<\/strong>.<\/p>\n<p data-start=\"89\" data-end=\"243\">Small and medium-capacity transformers usually use <strong data-start=\"140\" data-end=\"157\">layer winding<\/strong>, where the conductor is wound layer by layer, similar to winding a coil onto a spool.<\/p>\n<p data-start=\"245\" data-end=\"395\">Large-capacity and high-voltage transformers typically use <strong data-start=\"304\" data-end=\"320\">disc winding<\/strong>, where individual discs are wound separately and then connected in series.<\/p>\n<p data-start=\"397\" data-end=\"612\">The advantage of disc winding is that if a problem occurs in one disc, it will not affect the entire phase winding. Disc windings can improve the mechanical strength of the winding and optimize voltage distribution.<\/p>\n<h3 data-section-id=\"1ut8m80\" data-start=\"614\" data-end=\"657\"><span role=\"text\"><strong data-start=\"618\" data-end=\"657\">2.3 Axial Compression Force Control<\/strong><\/span><\/h3>\n<p data-start=\"659\" data-end=\"744\">During the winding process, axial compression force is a key manufacturing parameter.<\/p>\n<p data-start=\"746\" data-end=\"838\">If the compression force is too high, it may squeeze and damage the turn-to-turn insulation.<\/p>\n<p data-start=\"840\" data-end=\"1110\">If the compression force is insufficient, during transformer operation, electromagnetic vibration and thermal cycling caused by load changes may cause conductor displacement and friction, resulting in insulation wear and eventually leading to partial discharge failures.<\/p>\n<p data-start=\"1112\" data-end=\"1254\">The production process uses a hydraulic constant-pressure compression device, with compression pressure fluctuation controlled within <strong data-start=\"1246\" data-end=\"1253\">\u00b15%<\/strong>.<\/p>\n<p data-start=\"1256\" data-end=\"1473\">During the winding process, the main control parameters include conductor tension, insulation wrapping, spacer block arrangement, and compression pressure. Visual inspection and dimensional inspection are carried out.<\/p>\n<p data-start=\"1475\" data-end=\"1669\">The turn-to-turn impulse withstand voltage test is performed after the complete winding is finished. The dielectric loss test is conducted after winding assembly and vacuum drying are completed.<\/p>\n<h2 data-section-id=\"16rwhi\" data-start=\"1671\" data-end=\"1701\"><span role=\"text\"><strong data-start=\"1674\" data-end=\"1701\">III. Active Part Drying<\/strong><\/span><\/h2>\n<p data-start=\"1703\" data-end=\"1785\">Active part drying is a critical process that determines transformer service life.<\/p>\n<p data-start=\"1787\" data-end=\"1926\" data-is-last-node=\"\" data-is-only-node=\"\">After the windings and core are assembled, the complete active part is placed into a <strong data-start=\"1872\" data-end=\"1925\">vacuum drying chamber for vacuum drying treatment<\/strong>.<\/p>\n<p data-start=\"1787\" data-end=\"1926\" data-is-last-node=\"\" data-is-only-node=\"\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2246\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/5-Vacuum-drying-process-of-oil-immersed-power-transformer.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"z-0 flex min-h-[46px] justify-start\"><span role=\"text\"><strong data-start=\"4\" data-end=\"35\">3.1 Why Drying Is Necessary<\/strong><\/span><\/p>\n<p data-start=\"37\" data-end=\"200\">Insulation paper is a type of moisture-absorbing fiber material. The moisture content of the raw material is typically around <strong data-start=\"163\" data-end=\"172\">6%\u20138%<\/strong> when it leaves the factory.<\/p>\n<p data-start=\"202\" data-end=\"401\">If deep drying treatment is not performed before oil filling, the moisture remaining inside the insulation will gradually migrate into the insulating oil, reducing the electrical insulation strength.<\/p>\n<p data-start=\"403\" data-end=\"553\">More seriously, when the transformer operates under heat, moisture inside the insulation may vaporize and generate internal pressure, which can cause:<\/p>\n<ul data-start=\"555\" data-end=\"647\">\n<li data-section-id=\"14slbxr\" data-start=\"555\" data-end=\"578\">Insulation blistering<\/li>\n<li data-section-id=\"1ef6vwz\" data-start=\"579\" data-end=\"614\">Layer separation and delamination<\/li>\n<li data-section-id=\"17pm23o\" data-start=\"615\" data-end=\"647\">Reduced insulation performance<\/li>\n<\/ul>\n<p data-start=\"649\" data-end=\"742\">The generated bubbles can also trigger <strong data-start=\"688\" data-end=\"709\">partial discharge<\/strong> and accelerate insulation aging.<\/p>\n<p data-start=\"744\" data-end=\"904\">Especially for Middle East projects operating under long-term high-temperature conditions, the damaging effects caused by moisture become even more significant.<\/p>\n<p data-start=\"906\" data-end=\"1104\">Therefore, a strict vacuum drying process must be applied to reduce the residual moisture content in solid insulation to a very low level, ensuring the transformer\u2019s long-term operating reliability.<\/p>\n<h3 data-section-id=\"uqaa1j\" data-start=\"1106\" data-end=\"1143\"><span role=\"text\"><strong data-start=\"1110\" data-end=\"1143\">3.2 Drying Process Parameters<\/strong><\/span><\/h3>\n<p data-start=\"1145\" data-end=\"1291\"><strong data-start=\"1145\" data-end=\"1161\">IEC 60076-14<\/strong> provides guidance on transformer insulation drying processes, but the standard does not specify mandatory numerical requirements.<\/p>\n<p data-start=\"1293\" data-end=\"1409\">The general industry reference target is that the residual moisture content of solid insulation should be <strong data-start=\"1399\" data-end=\"1408\">\u22640.5%<\/strong>.<\/p>\n<p data-start=\"1411\" data-end=\"1546\">For Middle East projects, our internal factory control target is reduced to <strong data-start=\"1487\" data-end=\"1496\">\u22640.3%<\/strong>, which is stricter than common industry practice.<\/p>\n<p data-start=\"1548\" data-end=\"1581\">The drying process is as follows:<\/p>\n<p data-start=\"1583\" data-end=\"1685\">The active part is first heated to <strong data-start=\"1618\" data-end=\"1631\">110\u2013115\u00b0C<\/strong>, followed by atmospheric pre-drying for <strong data-start=\"1672\" data-end=\"1684\">12 hours<\/strong>.<\/p>\n<p data-start=\"1687\" data-end=\"1843\">After that, the transformer enters the high vacuum stage, where the vacuum level is reduced to <strong data-start=\"1782\" data-end=\"1797\">below 50 Pa<\/strong> and maintained for no less than <strong data-start=\"1830\" data-end=\"1842\">48 hours<\/strong>.<\/p>\n<p data-start=\"1845\" data-end=\"1906\">The complete drying cycle is normally <strong data-start=\"1883\" data-end=\"1905\">more than 72 hours<\/strong>.<\/p>\n<p data-start=\"1908\" data-end=\"2048\"><strong data-start=\"1908\" data-end=\"1917\">Note:<\/strong> The time is only the minimum process reference. The final drying completion judgment must be based on comprehensive evaluation of:<\/p>\n<ul data-start=\"2050\" data-end=\"2135\">\n<li data-section-id=\"qhfts4\" data-start=\"2050\" data-end=\"2074\">Temperature conditions<\/li>\n<li data-section-id=\"aha9on\" data-start=\"2075\" data-end=\"2089\">Vacuum level<\/li>\n<li data-section-id=\"ftsdil\" data-start=\"2090\" data-end=\"2113\">Moisture release rate<\/li>\n<li data-section-id=\"1csjidf\" data-start=\"2114\" data-end=\"2135\">Dew point variation<\/li>\n<\/ul>\n<p data-start=\"2137\" data-end=\"2197\">Drying completion cannot be determined simply by time alone.<\/p>\n<h3 data-section-id=\"1jidk2r\" data-start=\"2199\" data-end=\"2238\"><span role=\"text\"><strong data-start=\"2203\" data-end=\"2238\">3.3 Moisture Release Monitoring<\/strong><\/span><\/h3>\n<p data-start=\"2240\" data-end=\"2325\">During the drying process, a <strong data-start=\"2269\" data-end=\"2282\">condenser<\/strong> is used to collect the extracted moisture.<\/p>\n<p data-start=\"2327\" data-end=\"2411\">The amount of released water is monitored every hour and recorded as a drying curve.<\/p>\n<p data-start=\"2413\" data-end=\"2543\">When the moisture release rate drops below <strong data-start=\"2456\" data-end=\"2473\">5 ml per hour<\/strong>, the drying process is considered to have reached the required level.<\/p>\n<p data-start=\"2545\" data-end=\"2640\">Different manufacturers may use different drying curves. The actual drying duration depends on:<\/p>\n<ul data-start=\"2642\" data-end=\"2719\">\n<li data-section-id=\"1gbmgef\" data-start=\"2642\" data-end=\"2664\">Transformer capacity<\/li>\n<li data-section-id=\"17hoiq1\" data-start=\"2665\" data-end=\"2697\">Weight of insulation materials<\/li>\n<li data-section-id=\"v1hj7b\" data-start=\"2698\" data-end=\"2719\">Equipment structure<\/li>\n<\/ul>\n<p data-start=\"2721\" data-end=\"2835\">Determining whether drying is complete should not rely only on time. More importantly, engineers need to evaluate:<\/p>\n<ul data-start=\"2837\" data-end=\"2934\">\n<li data-section-id=\"h6fs4h\" data-start=\"2837\" data-end=\"2862\">Vacuum pressure changes<\/li>\n<li data-section-id=\"1gw0c35\" data-start=\"2863\" data-end=\"2895\">Condensed water release trends<\/li>\n<li data-section-id=\"1pvw12g\" data-start=\"2896\" data-end=\"2934\">Final insulation moisture indicators<\/li>\n<\/ul>\n<hr data-start=\"2936\" data-end=\"2939\" \/>\n<h2 data-section-id=\"1kmlkit\" data-start=\"2941\" data-end=\"2965\"><span role=\"text\"><strong data-start=\"2943\" data-end=\"2965\">IV. Final Assembly<\/strong><\/span><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2247\" src=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation-1024x576.jpg\" alt=\"\" width=\"1024\" height=\"576\" title=\"\" srcset=\"https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation-1024x576.jpg 1024w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation-300x169.jpg 300w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation-768x432.jpg 768w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation-18x10.jpg 18w, https:\/\/zishengtransformer.com\/wp-content\/uploads\/2026\/08\/6-Transformer-active-part-assembly-and-tank-installation.jpg 1092w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h3 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"1dr7azg\" data-start=\"0\" data-end=\"36\"><span role=\"text\"><strong data-start=\"4\" data-end=\"36\">4.1 Hot Assembly and Lifting<\/strong><\/span><\/h3>\n<p data-start=\"38\" data-end=\"158\">After the active part drying process is completed, <strong data-start=\"89\" data-end=\"157\">final assembly is carried out while the transformer is still hot<\/strong>.<\/p>\n<p data-start=\"160\" data-end=\"391\">Why assemble while hot? Because after drying, the insulation materials are in a dry and expanded state. Once the temperature drops, they may absorb moisture from the surrounding air, which would compromise the previous drying work.<\/p>\n<p data-start=\"393\" data-end=\"634\">The core and winding assembly are lifted into the transformer tank. The capacity of the <strong data-start=\"481\" data-end=\"499\">overhead crane<\/strong> depends on the equipment weight. Some transformers require only several tons of lifting capacity, while others require dozens of tons.<\/p>\n<p data-start=\"636\" data-end=\"866\">During the entire process, no collision or mechanical impact is allowed. The clearance between the winding end insulation components and the tank wall must comply with the design drawings, generally controlled within <strong data-start=\"853\" data-end=\"865\">30\u201350 mm<\/strong>.<\/p>\n<h3 data-section-id=\"1sk5zji\" data-start=\"868\" data-end=\"903\"><span role=\"text\"><strong data-start=\"872\" data-end=\"903\">4.2 Lead Connection Welding<\/strong><\/span><\/h3>\n<p data-start=\"905\" data-end=\"946\">The next step is lead connection welding.<\/p>\n<p data-start=\"948\" data-end=\"1038\">Although this process looks simple, it actually requires significant technical experience.<\/p>\n<p data-start=\"1040\" data-end=\"1177\">For copper conductor welding, we use <strong data-start=\"1077\" data-end=\"1115\">medium-frequency induction brazing<\/strong>, with the temperature controlled between <strong data-start=\"1157\" data-end=\"1176\">750\u00b0C and 850\u00b0C<\/strong>.<\/p>\n<p data-start=\"1179\" data-end=\"1302\">If the temperature is too low, the welding penetration will be insufficient, resulting in increased <strong data-start=\"1279\" data-end=\"1301\">contact resistance<\/strong>.<\/p>\n<p data-start=\"1304\" data-end=\"1412\">If the temperature is too high, the copper material may undergo <strong data-start=\"1368\" data-end=\"1381\">annealing<\/strong>, reducing mechanical strength.<\/p>\n<p data-start=\"1414\" data-end=\"1604\">After each lead is welded, a <strong data-start=\"1443\" data-end=\"1461\">micro-ohmmeter<\/strong> is used to measure the contact resistance and compare it with the standard value. If the deviation exceeds <strong data-start=\"1569\" data-end=\"1575\">5%<\/strong>, the welding must be redone.<\/p>\n<p data-start=\"1606\" data-end=\"1817\">In a Kuwait project, the customer required <strong data-start=\"1649\" data-end=\"1677\">X-ray inspection records<\/strong> for all welding points. A transformer may have more than twenty welding points of different sizes, and each one was inspected individually.<\/p>\n<p data-start=\"1819\" data-end=\"1914\">During the factory acceptance inspection, the customer reviewed the X-ray images and commented:<\/p>\n<p data-start=\"1916\" data-end=\"2010\"><strong data-start=\"1916\" data-end=\"2010\">\u201cYour welding quality control is even more rigorous than pressure pipeline manufacturing.\u201d<\/strong><\/p>\n<h2 data-section-id=\"1nm7gez\" data-start=\"2012\" data-end=\"2032\"><span role=\"text\"><strong data-start=\"2014\" data-end=\"2032\">V. Oil Filling<\/strong><\/span><\/h2>\n<p data-start=\"2034\" data-end=\"2114\">Oil filling is the final assembly process before the transformer tank is sealed.<\/p>\n<h3 data-section-id=\"65091e\" data-start=\"2116\" data-end=\"2141\"><span role=\"text\"><strong data-start=\"2120\" data-end=\"2141\">5.1 Oil Treatment<\/strong><\/span><\/h3>\n<p data-start=\"2143\" data-end=\"2186\">The insulating oil is processed in advance.<\/p>\n<p data-start=\"2188\" data-end=\"2293\">Whether it is <strong data-start=\"2202\" data-end=\"2217\">mineral oil<\/strong> or <strong data-start=\"2221\" data-end=\"2238\">natural ester<\/strong>, it must first undergo incoming inspection, including:<\/p>\n<ul data-start=\"2295\" data-end=\"2390\">\n<li data-section-id=\"ppzwo3\" data-start=\"2295\" data-end=\"2320\"><strong data-start=\"2297\" data-end=\"2320\">Dielectric strength<\/strong><\/li>\n<li data-section-id=\"ahrk2w\" data-start=\"2321\" data-end=\"2349\"><strong data-start=\"2323\" data-end=\"2349\">Dielectric loss factor<\/strong><\/li>\n<li data-section-id=\"1wz04mn\" data-start=\"2350\" data-end=\"2372\"><strong data-start=\"2352\" data-end=\"2372\">Moisture content<\/strong><\/li>\n<li data-section-id=\"1rzpqr8\" data-start=\"2373\" data-end=\"2390\"><strong data-start=\"2375\" data-end=\"2390\">Gas content<\/strong><\/li>\n<\/ul>\n<p data-start=\"2392\" data-end=\"2501\"><strong data-start=\"2392\" data-end=\"2419\">IEC 60296 and IEC 60422<\/strong> provide relevant guidance on insulating oil quality requirements and maintenance.<\/p>\n<p data-start=\"2503\" data-end=\"2566\">Unqualified oil is never allowed to enter the transformer tank.<\/p>\n<p data-start=\"2568\" data-end=\"2736\">The <strong data-start=\"2572\" data-end=\"2597\">oil filtration system<\/strong> operates continuously, and the oil is circulated under <strong data-start=\"2653\" data-end=\"2686\">heating and vacuum conditions<\/strong> to gradually remove moisture and dissolved gases.<\/p>\n<p data-start=\"2738\" data-end=\"2785\">Oil treatment usually requires <strong data-start=\"2769\" data-end=\"2784\">48\u201372 hours<\/strong>.<\/p>\n<p data-start=\"2787\" data-end=\"2797\">Only when:<\/p>\n<ul data-start=\"2799\" data-end=\"2891\">\n<li data-section-id=\"1p7h2v3\" data-start=\"2799\" data-end=\"2848\">Oil breakdown voltage is stable above <strong data-start=\"2839\" data-end=\"2848\">70 kV<\/strong><\/li>\n<li data-section-id=\"1c28ii0\" data-start=\"2849\" data-end=\"2891\">Dielectric loss factor is below <strong data-start=\"2883\" data-end=\"2891\">0.2%<\/strong><\/li>\n<\/ul>\n<p data-start=\"2893\" data-end=\"2928\">will the oil filling process begin.<\/p>\n<h3 data-section-id=\"1r898sz\" data-start=\"2930\" data-end=\"2960\"><span role=\"text\"><strong data-start=\"2934\" data-end=\"2960\">5.2 Vacuum Oil Filling<\/strong><\/span><\/h3>\n<p data-start=\"2962\" data-end=\"3027\">Oil filling is performed using the <strong data-start=\"2997\" data-end=\"3026\">vacuum oil filling method<\/strong>.<\/p>\n<p data-start=\"3029\" data-end=\"3140\">The transformer tank is evacuated to a vacuum level of <strong data-start=\"3084\" data-end=\"3099\">below 50 Pa<\/strong> and maintained for at least <strong data-start=\"3128\" data-end=\"3139\">8 hours<\/strong>.<\/p>\n<p data-start=\"3142\" data-end=\"3223\">Then, the treated oil is pumped into the transformer from the bottom of the tank.<\/p>\n<p data-start=\"3225\" data-end=\"3320\">The oil filling speed is critical and must be controlled at <strong data-start=\"3285\" data-end=\"3319\">no more than 1.5 tons per hour<\/strong>.<\/p>\n<p data-start=\"3322\" data-end=\"3524\">If the filling speed is too high, oil flow can generate <strong data-start=\"3378\" data-end=\"3400\">static electricity<\/strong>, and the issue of <strong data-start=\"3419\" data-end=\"3447\">oil flow electrification<\/strong> can become extremely dangerous in high-voltage, large-capacity transformers.<\/p>\n<h3 data-section-id=\"1xllsm6\" data-start=\"3526\" data-end=\"3550\"><span role=\"text\"><strong data-start=\"3530\" data-end=\"3550\">5.3 Oil Settling<\/strong><\/span><\/h3>\n<p data-start=\"3552\" data-end=\"3635\">After the transformer is filled with oil, it is left to <strong data-start=\"3608\" data-end=\"3634\">settle for 48\u201372 hours<\/strong>.<\/p>\n<p data-start=\"3637\" data-end=\"3711\">This allows small air bubbles inside the oil to gradually rise and escape.<\/p>\n<p data-start=\"3713\" data-end=\"3878\">After the settling period, another oil sample is taken for testing and compared with the results before oil filling. All performance indicators must not deteriorate.<\/p>\n<h2 data-section-id=\"4i28ru\" data-start=\"3880\" data-end=\"3931\"><span role=\"text\"><strong data-start=\"3882\" data-end=\"3931\">VI. Installation of Radiators and Accessories<\/strong><\/span><\/h2>\n<h3 data-section-id=\"1lcdqlh\" data-start=\"3933\" data-end=\"3966\"><span role=\"text\"><strong data-start=\"3937\" data-end=\"3966\">6.1 Radiator Installation<\/strong><\/span><\/h3>\n<p data-start=\"3968\" data-end=\"4054\">For <strong data-start=\"3972\" data-end=\"3996\">corrugated oil tanks<\/strong>, the radiator fins are welded before leaving the factory.<\/p>\n<p data-start=\"4056\" data-end=\"4142\">For transformers using <strong data-start=\"4079\" data-end=\"4103\">panel-type radiators<\/strong>, installation is completed separately.<\/p>\n<p data-start=\"4144\" data-end=\"4215\">Before radiator installation, a <strong data-start=\"4176\" data-end=\"4201\">pressure sealing test<\/strong> is performed.<\/p>\n<p data-start=\"4217\" data-end=\"4290\">A pressure of <strong data-start=\"4231\" data-end=\"4242\">0.1 MPa<\/strong> is maintained for <strong data-start=\"4261\" data-end=\"4273\">12 hours<\/strong> without leakage.<\/p>\n<p data-start=\"4292\" data-end=\"4371\">During installation, flange bolts must be tightened in a <strong data-start=\"4349\" data-end=\"4370\">diagonal sequence<\/strong>.<\/p>\n<p data-start=\"4373\" data-end=\"4474\">The tightening torque is controlled using a <strong data-start=\"4417\" data-end=\"4434\">torque wrench<\/strong>. Single-side tightening is not allowed.<\/p>\n<h3 data-section-id=\"1q176it\" data-start=\"4476\" data-end=\"4525\"><span role=\"text\"><strong data-start=\"4480\" data-end=\"4525\">6.2 Accessory Installation and Inspection<\/strong><\/span><\/h3>\n<p data-start=\"4527\" data-end=\"4558\">External accessories including:<\/p>\n<ul data-start=\"4560\" data-end=\"4692\">\n<li data-section-id=\"g0vs6v\" data-start=\"4560\" data-end=\"4574\"><strong data-start=\"4562\" data-end=\"4574\">Bushings<\/strong><\/li>\n<li data-section-id=\"12qg14a\" data-start=\"4575\" data-end=\"4593\"><strong data-start=\"4577\" data-end=\"4593\">Tap changers<\/strong><\/li>\n<li data-section-id=\"1xrqndi\" data-start=\"4594\" data-end=\"4616\"><strong data-start=\"4596\" data-end=\"4616\">Oil level gauges<\/strong><\/li>\n<li data-section-id=\"18jqqie\" data-start=\"4617\" data-end=\"4645\"><strong data-start=\"4619\" data-end=\"4645\">Temperature indicators<\/strong><\/li>\n<li data-section-id=\"13tu3rr\" data-start=\"4646\" data-end=\"4675\"><strong data-start=\"4648\" data-end=\"4675\">Pressure relief devices<\/strong><\/li>\n<li data-section-id=\"k9bjot\" data-start=\"4676\" data-end=\"4692\"><strong data-start=\"4678\" data-end=\"4692\">Gas relays<\/strong><\/li>\n<\/ul>\n<p data-start=\"4694\" data-end=\"4719\">are installed one by one.<\/p>\n<p data-start=\"4721\" data-end=\"4768\">Each accessory has corresponding IEC standards.<\/p>\n<p data-start=\"4770\" data-end=\"4782\">For example:<\/p>\n<ul data-start=\"4784\" data-end=\"4861\">\n<li data-section-id=\"bbke99\" data-start=\"4784\" data-end=\"4820\"><strong data-start=\"4786\" data-end=\"4820\">Bushings comply with IEC 60137<\/strong><\/li>\n<li data-section-id=\"1dzzx82\" data-start=\"4821\" data-end=\"4861\"><strong data-start=\"4823\" data-end=\"4861\">Tap changers comply with IEC 60214<\/strong><\/li>\n<\/ul>\n<p data-start=\"4863\" data-end=\"4963\">Gas relays are tested for operation performance and sealing according to relevant product standards.<\/p>\n<p data-start=\"4965\" data-end=\"5024\">Each accessory is inspected immediately after installation.<\/p>\n<p data-start=\"5026\" data-end=\"5053\">After bushing installation:<\/p>\n<ul data-start=\"5055\" data-end=\"5106\">\n<li data-section-id=\"vjdvo3\" data-start=\"5055\" data-end=\"5080\">Dielectric loss testing<\/li>\n<li data-section-id=\"1f10lnq\" data-start=\"5081\" data-end=\"5106\">Capacitance measurement<\/li>\n<\/ul>\n<p data-start=\"5108\" data-end=\"5122\">are performed.<\/p>\n<p data-start=\"5124\" data-end=\"5155\">After tap changer installation:<\/p>\n<ul data-start=\"5157\" data-end=\"5208\">\n<li data-section-id=\"12m64e0\" data-start=\"5157\" data-end=\"5174\">Operation tests<\/li>\n<li data-section-id=\"1d9gkz6\" data-start=\"5175\" data-end=\"5208\">Contact resistance measurements<\/li>\n<\/ul>\n<p data-start=\"5210\" data-end=\"5226\">are carried out.<\/p>\n<p data-start=\"5228\" data-end=\"5302\" data-is-last-node=\"\" data-is-only-node=\"\">Any component that does not meet the requirements is replaced immediately.<\/p>\n<div class=\"qMYqUG_convSearchResultHighlightRoot\">\n<div class=\"\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-50\" data-is-intersecting=\"true\">\n<section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-50\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-50\" data-testid=\"conversation-turn-30\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\">\n<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"0b5d236f-c6c9-4816-a0e9-2854022655e3\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-thinking\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<h2 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"h2jaa7\" data-start=\"0\" data-end=\"32\"><span role=\"text\"><strong data-start=\"2\" data-end=\"32\">VII. Final Product Testing<\/strong><\/span><\/h2>\n<p data-start=\"34\" data-end=\"195\">Final product testing, also known as <strong data-start=\"71\" data-end=\"104\">Factory Acceptance Test (FAT)<\/strong> in projects, is the most important quality verification stage before transformer delivery.<\/p>\n<p data-start=\"197\" data-end=\"270\">The <strong data-start=\"201\" data-end=\"214\">IEC 60076<\/strong> series divides transformer tests into three categories:<\/p>\n<ul data-start=\"272\" data-end=\"328\">\n<li data-section-id=\"1if9z77\" data-start=\"272\" data-end=\"291\"><strong data-start=\"274\" data-end=\"291\">Routine tests<\/strong><\/li>\n<li data-section-id=\"1y8scl1\" data-start=\"292\" data-end=\"308\"><strong data-start=\"294\" data-end=\"308\">Type tests<\/strong><\/li>\n<li data-section-id=\"cssszw\" data-start=\"309\" data-end=\"328\"><strong data-start=\"311\" data-end=\"328\">Special tests<\/strong><\/li>\n<\/ul>\n<h3 data-section-id=\"e7n65x\" data-start=\"330\" data-end=\"355\"><span role=\"text\"><strong data-start=\"334\" data-end=\"355\">7.1 Routine Tests<\/strong><\/span><\/h3>\n<p data-start=\"357\" data-end=\"415\"><strong data-start=\"357\" data-end=\"415\">Routine tests are performed on every transformer unit.<\/strong><\/p>\n<p data-start=\"417\" data-end=\"440\">The test items include:<\/p>\n<ul data-start=\"442\" data-end=\"672\">\n<li data-section-id=\"5dc6hj\" data-start=\"442\" data-end=\"465\"><strong data-start=\"444\" data-end=\"465\">No-load loss test<\/strong><\/li>\n<li data-section-id=\"amc6mz\" data-start=\"466\" data-end=\"486\"><strong data-start=\"468\" data-end=\"486\">Load loss test<\/strong><\/li>\n<li data-section-id=\"hrrca6\" data-start=\"487\" data-end=\"521\"><strong data-start=\"489\" data-end=\"521\">Short-circuit impedance test<\/strong><\/li>\n<li data-section-id=\"ika0xp\" data-start=\"522\" data-end=\"548\"><strong data-start=\"524\" data-end=\"548\">No-load current test<\/strong><\/li>\n<li data-section-id=\"8wx3qo\" data-start=\"549\" data-end=\"590\"><strong data-start=\"551\" data-end=\"590\">Voltage ratio and vector group test<\/strong><\/li>\n<li data-section-id=\"mssl55\" data-start=\"591\" data-end=\"635\"><strong data-start=\"593\" data-end=\"635\">Power frequency withstand voltage test<\/strong><\/li>\n<li data-section-id=\"br7gcm\" data-start=\"636\" data-end=\"672\"><strong data-start=\"638\" data-end=\"672\">Induced voltage withstand test<\/strong><\/li>\n<\/ul>\n<p data-start=\"674\" data-end=\"726\">All seven items must be completed without exception.<\/p>\n<h3 data-section-id=\"1xhs66o\" data-start=\"728\" data-end=\"750\"><span role=\"text\"><strong data-start=\"732\" data-end=\"750\">7.2 Type Tests<\/strong><\/span><\/h3>\n<p data-start=\"752\" data-end=\"833\"><strong data-start=\"752\" data-end=\"833\">Type tests are generally performed on the first unit of a transformer design.<\/strong><\/p>\n<p data-start=\"835\" data-end=\"858\">The test items include:<\/p>\n<ul data-start=\"860\" data-end=\"1021\">\n<li data-section-id=\"1cb23i7\" data-start=\"860\" data-end=\"887\"><strong data-start=\"862\" data-end=\"887\">Temperature rise test<\/strong><\/li>\n<li data-section-id=\"1tkij9x\" data-start=\"888\" data-end=\"916\"><strong data-start=\"890\" data-end=\"916\">Lightning impulse test<\/strong><\/li>\n<li data-section-id=\"1cfa764\" data-start=\"917\" data-end=\"962\"><strong data-start=\"919\" data-end=\"962\">Short-circuit withstand capability test<\/strong><\/li>\n<li data-section-id=\"a7f1h3\" data-start=\"963\" data-end=\"992\"><strong data-start=\"965\" data-end=\"992\">Sound level measurement<\/strong><\/li>\n<li data-section-id=\"14i4zdj\" data-start=\"993\" data-end=\"1021\"><strong data-start=\"995\" data-end=\"1021\">Switching impulse test<\/strong><\/li>\n<\/ul>\n<p data-start=\"1023\" data-end=\"1201\">For transformers used in Middle East projects, the first unit is usually sent to an <strong data-start=\"1107\" data-end=\"1145\">independent third-party laboratory<\/strong> for testing, with the customer present for supervision.<\/p>\n<h3 data-section-id=\"e07zwo\" data-start=\"1203\" data-end=\"1228\"><span role=\"text\"><strong data-start=\"1207\" data-end=\"1228\">7.3 Special Tests<\/strong><\/span><\/h3>\n<p data-start=\"1230\" data-end=\"1296\"><strong data-start=\"1230\" data-end=\"1296\">Special tests are conducted according to project requirements.<\/strong><\/p>\n<p data-start=\"1298\" data-end=\"1320\">Typical items include:<\/p>\n<ul data-start=\"1322\" data-end=\"1400\">\n<li data-section-id=\"5zmwlx\" data-start=\"1322\" data-end=\"1357\"><strong data-start=\"1324\" data-end=\"1357\">Partial discharge measurement<\/strong><\/li>\n<li data-section-id=\"xb2eff\" data-start=\"1358\" data-end=\"1400\"><strong data-start=\"1360\" data-end=\"1400\">Oil flow electrification measurement<\/strong><\/li>\n<\/ul>\n<p data-start=\"1402\" data-end=\"1498\">For Middle East projects, partial discharge testing has basically become a standard requirement.<\/p>\n<h3 data-section-id=\"1bcmqoz\" data-start=\"1500\" data-end=\"1528\"><span role=\"text\"><strong data-start=\"1504\" data-end=\"1528\">7.4 Actual Test Data<\/strong><\/span><\/h3>\n<p data-start=\"1530\" data-end=\"1612\">A <strong data-start=\"1532\" data-end=\"1563\">20,000kVA\/132kV transformer<\/strong> for a Saudi project that was recently completed:<\/p>\n<p data-start=\"1614\" data-end=\"1696\"><strong data-start=\"1614\" data-end=\"1631\">No-load loss:<\/strong><br data-start=\"1631\" data-end=\"1634\" \/>Design guaranteed value: 16.5 kW<br data-start=\"1666\" data-end=\"1669\" \/>Measured value: <strong data-start=\"1685\" data-end=\"1696\">15.3 kW<\/strong><\/p>\n<p data-start=\"1698\" data-end=\"1801\"><strong data-start=\"1698\" data-end=\"1738\">Load loss (converted value at 75\u00b0C):<\/strong><br data-start=\"1738\" data-end=\"1741\" \/>Design guaranteed value: 85 kW<br data-start=\"1771\" data-end=\"1774\" \/>Measured value: <strong data-start=\"1790\" data-end=\"1801\">83.7 kW<\/strong><\/p>\n<p data-start=\"1803\" data-end=\"1880\"><strong data-start=\"1803\" data-end=\"1831\">Short-circuit impedance:<\/strong><br data-start=\"1831\" data-end=\"1834\" \/>Design value: 13%<br data-start=\"1851\" data-end=\"1854\" \/>Measured value: <strong data-start=\"1870\" data-end=\"1880\">13.12%<\/strong><\/p>\n<p data-start=\"1882\" data-end=\"1956\"><strong data-start=\"1882\" data-end=\"1911\">Top oil temperature rise:<\/strong><br data-start=\"1911\" data-end=\"1914\" \/>IEC limit: 60K<br data-start=\"1928\" data-end=\"1931\" \/>Measured value: <strong data-start=\"1947\" data-end=\"1956\">41.2K<\/strong><\/p>\n<p data-start=\"1958\" data-end=\"2041\"><strong data-start=\"1958\" data-end=\"1996\">Winding hot-spot temperature rise:<\/strong><br data-start=\"1996\" data-end=\"1999\" \/>IEC limit: 78K<br data-start=\"2013\" data-end=\"2016\" \/>Measured value: <strong data-start=\"2032\" data-end=\"2041\">53.5K<\/strong><\/p>\n<p data-start=\"2043\" data-end=\"2104\"><strong data-start=\"2043\" data-end=\"2065\">Partial discharge:<\/strong><br data-start=\"2065\" data-end=\"2068\" \/>At 1.1 times rated voltage: <strong data-start=\"2096\" data-end=\"2104\">18pC<\/strong><\/p>\n<p data-start=\"2106\" data-end=\"2144\">Every parameter has sufficient margin.<\/p>\n<p data-start=\"2146\" data-end=\"2285\">During actual manufacturing, we focus not only on meeting the minimum standard requirements but also on creating sufficient quality margin.<\/p>\n<h2 data-section-id=\"8mvdly\" data-start=\"2287\" data-end=\"2327\"><span role=\"text\"><strong data-start=\"2289\" data-end=\"2327\">VIII. Two Additional Special Tests<\/strong><\/span><\/h2>\n<h3 data-section-id=\"s045no\" data-start=\"2329\" data-end=\"2377\"><span role=\"text\"><strong data-start=\"2333\" data-end=\"2377\">8.1 High-Temperature Simulated Load Test<\/strong><\/span><\/h3>\n<p data-start=\"2379\" data-end=\"2423\"><strong data-start=\"2379\" data-end=\"2423\">High-temperature simulated load testing.<\/strong><\/p>\n<p data-start=\"2425\" data-end=\"2637\">In a workshop environment with an ambient temperature of <strong data-start=\"2482\" data-end=\"2504\">not less than 45\u00b0C<\/strong> \u2014 summer conditions are ideal for this test \u2014 the transformer is operated at <strong data-start=\"2582\" data-end=\"2606\">1.1 times rated load<\/strong> continuously for <strong data-start=\"2624\" data-end=\"2636\">72 hours<\/strong>.<\/p>\n<p data-start=\"2639\" data-end=\"2776\">During the entire process, temperature rise at different locations and <strong data-start=\"2710\" data-end=\"2740\">oil dissolved gas analysis<\/strong> changes are continuously monitored.<\/p>\n<p data-start=\"2778\" data-end=\"2919\">After passing this test, we can have higher confidence that the transformer can operate reliably under full load in a 50\u00b0C field environment.<\/p>\n<h3 data-section-id=\"jwvv6s\" data-start=\"2921\" data-end=\"2965\"><span role=\"text\"><strong data-start=\"2925\" data-end=\"2965\">8.2 Dust Environment Simulation Test<\/strong><\/span><\/h3>\n<p data-start=\"2967\" data-end=\"3007\"><strong data-start=\"2967\" data-end=\"3007\">Dust environment simulation testing.<\/strong><\/p>\n<p data-start=\"3009\" data-end=\"3147\">Inside a sealed test chamber, <strong data-start=\"3039\" data-end=\"3076\">ISO 12103-1 A2 standard fine dust<\/strong> is blown onto the external surface of the transformer for <strong data-start=\"3135\" data-end=\"3146\">2 hours<\/strong>.<\/p>\n<p data-start=\"3149\" data-end=\"3238\">After completion, a white cloth is used to wipe the internal surfaces near sealing areas.<\/p>\n<p data-start=\"3240\" data-end=\"3294\"><strong data-start=\"3240\" data-end=\"3294\">No visible dust particles are allowed to be found.<\/strong><\/p>\n<p data-start=\"3296\" data-end=\"3410\">This test is not required by IEC standards. It is an additional internal verification test developed by ourselves.<\/p>\n<p data-start=\"3412\" data-end=\"3552\">If a transformer is expected to operate in desert conditions for 25 years, spending two additional days on testing is completely worthwhile.<\/p>\n<h2 data-section-id=\"zg6z2b\" data-start=\"3554\" data-end=\"3590\"><span role=\"text\"><strong data-start=\"3556\" data-end=\"3590\">IX. Frequently Asked Questions<\/strong><\/span><\/h2>\n<p data-start=\"3592\" data-end=\"3690\"><strong data-start=\"3592\" data-end=\"3690\">What is the difference between IEC standards and ANSI standards? Which standard do you follow?<\/strong><\/p>\n<p data-start=\"3692\" data-end=\"3748\">The Middle East market mainly follows <strong data-start=\"3730\" data-end=\"3747\">IEC standards<\/strong>.<\/p>\n<p data-start=\"3750\" data-end=\"3867\">Saudi Arabia\u2019s <strong data-start=\"3765\" data-end=\"3773\">SASO<\/strong>, UAE standards <strong data-start=\"3789\" data-end=\"3798\">UAE.S<\/strong>, and Qatar standards <strong data-start=\"3820\" data-end=\"3827\">QCS<\/strong> generally adopt IEC-based requirements.<\/p>\n<p data-start=\"3869\" data-end=\"3953\">All our products are designed and manufactured according to <strong data-start=\"3929\" data-end=\"3942\">IEC 60076<\/strong> standards.<\/p>\n<p data-start=\"3955\" data-end=\"4120\">If customers specifically require <strong data-start=\"3989\" data-end=\"3997\">ANSI<\/strong> standards, we can also provide ANSI-compliant solutions, but the majority of Middle East projects follow the IEC approach.<\/p>\n<h3 data-start=\"4122\" data-end=\"4166\"><strong data-start=\"4122\" data-end=\"4166\">How long is the manufacturing lead time?<\/strong><\/h3>\n<p data-start=\"4168\" data-end=\"4290\">For transformers <strong data-start=\"4185\" data-end=\"4200\">below 20MVA<\/strong>, the period from contract signing to shipment readiness is approximately <strong data-start=\"4274\" data-end=\"4289\">90\u2013100 days<\/strong>.<\/p>\n<p data-start=\"4292\" data-end=\"4410\">Compared with conventional products, the additional time mainly comes from extra desert-specific testing requirements.<\/p>\n<p data-start=\"4412\" data-end=\"4522\">For urgent projects, early communication is required. The fastest delivery can be achieved within <strong data-start=\"4510\" data-end=\"4521\">75 days<\/strong>.<\/p>\n<h3 data-start=\"4524\" data-end=\"4561\"><strong data-start=\"4524\" data-end=\"4561\">Where do the materials come from?<\/strong><\/h3>\n<p data-start=\"4563\" data-end=\"4790\">According to project requirements, we can use internationally recognized brands or customer-specified supply systems, including imported silicon steel sheets, insulation materials, transformer oil, and high-voltage accessories.<\/p>\n<h3 data-start=\"4792\" data-end=\"4844\"><strong data-start=\"4792\" data-end=\"4844\">Can customers inspect the manufacturing process?<\/strong><\/h3>\n<p data-start=\"4846\" data-end=\"4898\">Customers are always welcome to conduct inspections.<\/p>\n<p data-start=\"4900\" data-end=\"4989\">Our factory has a dedicated <strong data-start=\"4928\" data-end=\"4949\">inspection office<\/strong> with complete communication facilities.<\/p>\n<p data-start=\"4991\" data-end=\"5053\">For key manufacturing stages, we provide advance notification.<\/p>\n<p data-start=\"5055\" data-end=\"5155\">If customers cannot visit personally, we can provide video monitoring and remote inspection support.<\/p>\n<p data-start=\"5157\" data-end=\"5228\">The following stages are strongly recommended for customer supervision:<\/p>\n<ul data-start=\"5230\" data-end=\"5315\">\n<li data-section-id=\"5fk23h\" data-start=\"5230\" data-end=\"5249\"><strong data-start=\"5232\" data-end=\"5249\">Core stacking<\/strong><\/li>\n<li data-section-id=\"n79whq\" data-start=\"5250\" data-end=\"5269\"><strong data-start=\"5252\" data-end=\"5269\">Vacuum drying<\/strong><\/li>\n<li data-section-id=\"1j5h7jh\" data-start=\"5270\" data-end=\"5287\"><strong data-start=\"5272\" data-end=\"5287\">Oil filling<\/strong><\/li>\n<li data-section-id=\"cl6gxl\" data-start=\"5288\" data-end=\"5315\"><strong data-start=\"5290\" data-end=\"5315\">Final product testing<\/strong><\/li>\n<\/ul>\n<p data-start=\"5317\" data-end=\"5392\" data-is-last-node=\"\" data-is-only-node=\"\">These are the critical quality control points of transformer manufacturing.<\/p>\n<div class=\"qMYqUG_convSearchResultHighlightRoot\">\n<div class=\"\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-51\" data-is-intersecting=\"true\">\n<section class=\"text-token-text-primary w-full focus:outline-none has-data-writing-block:pointer-events-none [&amp;:has([data-writing-block])&gt;*]:pointer-events-auto R6Vx5W_threadScrollVars scroll-mb-[calc(var(--scroll-root-safe-area-inset-bottom,0px)+var(--thread-response-height))] scroll-mt-[calc(var(--header-height)+min(200px,max(70px,20svh)))]\" dir=\"auto\" data-turn-id=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-51\" data-turn-id-container=\"request-6a8c07ec-c59c-83e9-adc8-dacb0b3e6bfd-51\" data-testid=\"conversation-turn-32\" data-turn=\"assistant\">\n<div class=\"text-base my-auto mx-auto pb-8 [--thread-content-margin:var(--thread-content-margin-xs,calc(var(--spacing)*4))] @w-sm\/main:[--thread-content-margin:var(--thread-content-margin-sm,calc(var(--spacing)*6))] @w-lg\/main:[--thread-content-margin:var(--thread-content-margin-lg,calc(var(--spacing)*16))] px-(--thread-content-margin)\">\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1 group\/turn-messages focus-visible:outline-hidden relative flex w-full min-w-0 flex-col agent-turn\" data-conversation-screenshot-content=\"\">\n<div class=\"flex max-w-full flex-col gap-4 grow\">\n<div class=\"min-h-8 text-message relative flex w-full flex-col items-end gap-2 text-start break-words whitespace-normal outline-none keyboard-focused:focus-ring [.text-message+&amp;]:mt-1\" dir=\"auto\" tabindex=\"0\" data-message-author-role=\"assistant\" data-message-id=\"63b73c7b-78c5-4a1a-8e85-09bc3644f4cc\" data-turn-start-message=\"true\" data-message-model-slug=\"gpt-5-6-thinking\">\n<div class=\"flex w-full flex-col gap-1 empty:hidden\">\n<div class=\"markdown prose dark:prose-invert wrap-break-word w-full light markdown-new-styling\">\n<h2 class=\"PDq2pG_selectionAnchorContainer\" data-section-id=\"3ukvql\" data-start=\"0\" data-end=\"22\"><span role=\"text\"><strong data-start=\"2\" data-end=\"22\">X. Final Remarks<\/strong><\/span><\/h2>\n<p data-start=\"24\" data-end=\"185\">IEC standards are not just certificates displayed on the wall. They are detailed operating requirements verified and controlled through every manufacturing step.<\/p>\n<p data-start=\"187\" data-end=\"361\">Manufacturing is not about whether a company can achieve a certain standard once. The real challenge is whether it can achieve the same quality level consistently every time.<\/p>\n<p data-start=\"363\" data-end=\"467\">A transformer operating in a desert environment needs to withstand <strong data-start=\"430\" data-end=\"466\">25 years of continuous operation<\/strong>.<\/p>\n<p data-start=\"469\" data-end=\"553\">From the very first step of silicon steel sheet cutting, there can be no compromise.<\/p>\n<p data-start=\"555\" data-end=\"859\"><strong data-start=\"555\" data-end=\"575\">Zisheng Electric<\/strong> has been continuously involved in projects across the Middle East, Africa, South America, and other regions, providing <strong data-start=\"695\" data-end=\"757\">EPC contractors, project owners, and engineering companies<\/strong> with transformer selection, technical documentation support, and manufacturing coordination services.<\/p>\n<p data-start=\"861\" data-end=\"907\">Our <strong data-start=\"865\" data-end=\"906\">annual repair rate remains below 0.5%<\/strong>.<\/p>\n<p data-start=\"909\" data-end=\"1037\">We may not always be the lowest-cost supplier, but our reputation is built through every transformer manufactured and delivered.<\/p>\n<p data-start=\"1039\" data-end=\"1070\">Our product portfolio includes:<a href=\"https:\/\/zishengtransformer.com\/oil-immersed-transformer\/\">Oil-Immersed Transformers<\/a>, <a href=\"https:\/\/zishengtransformer.com\/substation-transformer\/\" target=\"_blank\" rel=\"noopener\">Compact Substation<\/a>, <a href=\"https:\/\/zishengtransformer.com\/pad-mounted-transformer\/\" target=\"_blank\" rel=\"noopener\">Pad Mounted Transformers<\/a>, <a href=\"https:\/\/zishengtransformer.com\/pole-mounted-transformer\/\" target=\"_blank\" rel=\"noopener\">Pole Mounted Transformers<\/a> and <a href=\"https:\/\/zishengtransformer.com\/dry-type-transformer\/\" target=\"_blank\" rel=\"noopener\">Dry Type Transformers<\/a>.<\/p>\n<p data-start=\"1263\" data-end=\"1502\">Zisheng Electric has obtained <strong data-start=\"1293\" data-end=\"1321\">22 utility model patents<\/strong> and <strong data-start=\"1326\" data-end=\"1351\">3 software copyrights<\/strong>, is certified under the <strong data-start=\"1376\" data-end=\"1414\">ISO 9001 Quality Management System<\/strong>, and complies with relevant <strong data-start=\"1443\" data-end=\"1460\">IEC standards<\/strong> for transformer design and manufacturing.<\/p>\n<p data-start=\"1504\" data-end=\"1632\">For projects in different regions, transformer selection requires more than simply considering rated capacity and voltage level.<\/p>\n<p data-start=\"1809\" data-end=\"1980\"><a href=\"https:\/\/zishengtransformer.com\/contactus.html\">If you are working on an <strong data-start=\"1834\" data-end=\"1883\">oil-immersed power transformer project design<\/strong>, technical specification review, or supplier evaluation, please provide your project parameters.<\/a><\/p>\n<p data-start=\"1982\" data-end=\"2121\" data-is-last-node=\"\" data-is-only-node=\"\">Our engineering team will assist with technical matching according to IEC requirements and provide an initial response within <strong data-start=\"2108\" data-end=\"2120\">24 hours<\/strong>.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"z-0 flex min-h-[46px] justify-start\"><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"mt-3 w-full empty:hidden has-[&gt;_:empty]:hidden\">\n<div class=\"text-center\"><\/div>\n<\/div>\n<\/div>\n<div class=\"[--thread-content-max-width:40rem] @w-lg\/main:[--thread-content-max-width:48rem] mx-auto max-w-(--thread-content-max-width) flex-1\" data-conversation-screenshot-content=\"\">\n<div><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<div class=\"pointer-events-none -mt-px h-px translate-y-(--scroll-root-safe-area-inset-bottom)\" aria-hidden=\"true\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u064a\u0634\u0631\u062d \u0647\u0630\u0627 \u0627\u0644\u062f\u0644\u064a\u0644 \u0639\u0645\u0644\u064a\u0629 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0644\u0644\u0645\u062d\u0648\u0644\u0627\u062a \u0627\u0644\u0645\u063a\u0645\u0648\u0631\u0629 \u0628\u0627\u0644\u0632\u064a\u062a \u0648\u0627\u0644\u0645\u062a\u0648\u0627\u0641\u0642\u0629 \u0645\u0639 \u0645\u0639\u0627\u064a\u064a\u0631 IEC\u060c \u0628\u062f\u0621\u0627\u064b \u0645\u0646 \u0641\u062d\u0635 \u0627\u0644\u0645\u0648\u0627\u062f\u060c \u0648\u062a\u062c\u0645\u064a\u0639 \u0627\u0644\u0642\u0644\u0628\u060c \u0648\u0627\u0644\u0644\u0641\u060c \u0648\u0627\u0644\u062a\u062c\u0641\u064a\u0641\u060c \u0648\u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u064a\u062a\u060c \u0648\u0635\u0648\u0644\u0627\u064b \u0625\u0644\u0649 \u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a \u0627\u0644\u0642\u0628\u0648\u0644 \u0641\u064a \u0627\u0644\u0645\u0635\u0646\u0639.<\/p>","protected":false},"author":2,"featured_media":2242,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20],"tags":[33],"class_list":["post-2241","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-solutions","tag-iec-transformer-transformer-manufacturing-process-oil-immersed-transformer-power-transformer-manufacturer-factory-acceptance-test-transformer-testing-epc-transformer-supplier-middle-east-transformer"],"acf":[],"_links":{"self":[{"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/posts\/2241","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/comments?post=2241"}],"version-history":[{"count":2,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/posts\/2241\/revisions"}],"predecessor-version":[{"id":2249,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/posts\/2241\/revisions\/2249"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/media\/2242"}],"wp:attachment":[{"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/media?parent=2241"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/categories?post=2241"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zishengtransformer.com\/ar\/wp-json\/wp\/v2\/tags?post=2241"}],"curies":[{"name":"\u0648\u0648\u0631\u062f\u0628\u0631\u064a\u0633","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}